1 Using The Data In Table 2 3 Calculate Average Fixed Cost And Average Variable Cost 2625114

1. Using the data in Table 2.3, calculate average fixed cost and average variable cost. Plot these on a graph with the average total cost and briefly explain the result.

2. When should a business cease production in the short run?

3. What costs need to be covered in the long run?